April 6, 2022 Company Updates

ZIEGLER delivers new Z6 to Kortrijk-Wevelgem International Airport

Almost one year after receiving the order (see ZIEGLER press release March 2021), ZIEGLER Group delivered a new Z6 Airport Rescue and Fire Fighting Vehicle to Kortrijk-Wevelgem International Airport in Belgium on March 31st, 2022.

The Crashtender is built on a TITAN 6x6 chassis with steerable rear axle and is driven by a 770 HP Scania V8 engine. The innovative and continuously variable transmission by Kessler completes the new drive concept and actually brings this high performance to the road. This translates into unrivaled acceleration and top speed in this particular application.
In addition, the new vehicle provides up to 13,000 l of extinguishing water, 1,500 l of foam and 250 kg of extinguishing powder for concentrated extinguishing power in the airport. The FPN 10-8000 is precisely designed to supply the turrets (the newly developed ZT-6000 as a roof mounted turret), the rapid intervention unit and the self-protection system with extinguishing power. The Z-Cab Air is certified according ECE R 29-3 and therefore guarantees highest occupant protection. The vehicle will be controlled and operated via Z-Control of the latest generation according to the whole ZIEGLER line.

Furthermore, the order includes an All-In service contract of 10 years, which will be carried out by Ziegler Brandweertechniek B.V. The airport has also already made provisions for 2023: another order for a new Z6 will be placed in September of this year.

More information can be found in the official press release. 

 

More posts

March 23, 2026

Six new ZIEGLER HLF 20 all at once

ZIEGLER has delivered six new HLF 20 firefighting vehicles to the Göttingen Professional and Volunteer Fire Departments. By procuring these identical firefighting vehicles, the city of Göttingen is sending a clear signal of its commitment to the ongoing modernization of its firefighting equipment.
Show post
March 17, 2026

ZIEGLER at INTERSCHUTZ 2026

According to the motto #readywhenyouare, at INTERSCHUTZ 2026 ZIEGLER will demonstrate that the company is always ready when fire departments and rescue services need state-of-the-art technology and the best support.
Show post
February 11, 2026

ZIEGLER on track for success in 2030

Strong year in 2025 and ambitious plans for 2026 – 2030
Show post
January 23, 2026

ZIEGLER wins contract for 69 LF 10 firefighting vehicles

Albert Ziegler GmbH has been awarded the contract to supply 69 LF 10 firefighting vehicles on MAN chassis as part of the first state procurement for firefighting vehicles in the state of Baden-Württemberg.
Show post
December 5, 2025

From Giengen – for Giengen

ZIEGLER hands over two new HLF 10 to its hometown
Show post