Language
https://www.ziegler.de/mediadatabase/news/2023/vehicle_deliveries_2023/news_vehicle_deliveries_202309/tlf4000-stockach-sv.jpg

ZIEGLER TLF 4000 to the fire department of Stockach

04. September 2023 | Vehicle deliveries

On 04.09.2023, we delivered a TLF 4000 to the fire department of Stockach.
 

Our special features

  • ALPAS® superstructure of the latest generation
  • Z-Control of the latest generation – easy operation
  • Z-Vision LED ambient lighting
  • Roller shutter boxes on the roof for a largest possible loading volume


We wish a safe trip at all times!

ZIEGLER News

Latest deliveries